BioFire Manufacturing & Office Building

The front of a modern building with a flat roof that sticks out far over the entrance

Daw Construction Group LLC subcontracted with Okland Construction to build Biofire’s new manufacturing facility that focuses on infectious disease. This project was in the two final months near completion when the COVID-19 outbreak occurred and a 5.7 magnitude earthquake which was Utah’s biggest earthquake in 28 years.

“Trade partners stepped (up) to the new challenge and got to work piecing these complications back together, not losing sight of our original end-date commitment.”
Scott Hansen with Okland Construction said.

Daw provided non-structural metal framing, gypsum board shaft wall assembly, gypsum board, insulation and firestopping on this project assisting the contractor to finish the project before the anticipated projection date.

  • Category

    Commercial Insulation / Drywall
  • Contractor

    Okland Construction
  • Project Dates

    12/2018 - 10/2022
  • Square Footage

    305,049
  • Location

    Salt Lake City, UT